Deutsch
|
English

Create building cost center

Property Management

IC1618
Case worker
Property Management

Building cost centers are a specific type of cost center used, among other things, in eTASK Operating Cost Accounting to track the operating costs associated with a building.

This is done using a form. The basic function of forms is described in this article: 📄 Formulare IC1105

Orange banner with white text reading
Orange banner with white text reading "Vorgehensweise im FM-Portal" (Procedure in FM Portal)

Path to the starting point: Basic Data - Cost Centers

  1. Create a new record in the table.

Tip: The name of a cost center is usually the name of the building to which it refers.

  1. Enter a cost center number in the Cost Center/Account field and a cost center name in the Name field.

  2. In the Cost Center Type dropdown, select “Building Cost Center.” Select a company.

  3. Click Save in the toolbar.

  4. In the Buildings section (for building cost centers), assign the buildings to which the costs are to be charged.

You can now use the cost center for the allocation of operating costs.

Orange banner with light bulb icon and German text
Orange banner with light bulb icon and German text "Guck auch mal hier rein:" suggesting to look inside

📄 Umlageschlüssel IC9019

📄 Umlageschlüssel zu Räumen hinzufügen IC2240

📄 Umlageschlüssel aus Räumen entfernen IC2241

Orange button with book icon and German text
Orange button with book icon and German text "Könnte diese Funktion hilfreich sein? Hier erfährst du mehr zu diesem Produkt:"

To product page
War dieser Artikel hilfreich?