Deutsch
|
English

Maintenance

FM-Portal

IC2380
FM-Portal

To learn more about maintenance, you can start by reading the following articles. You can also find additional information using the menu on the right.

  • Learn the terminology 📄 Begriffe aus eTASK.Instandhaltung IC1166

  • Getting to know the workflow 📄 Rollen im Workflow von eTASK.Instandhaltung IC1189

  • Create an order

  • Assign work plans 📄 Einmaligen Aufträgen Arbeitspläne zuordnen IC1229

  • Get to know the reports 📄 Auswertungen in eTASK.Instandhaltung IC1175

  • The Maintenance module consists of three pillars. First, a task must be defined. This task applies to a specific asset type (e.g., fire extinguishers).

  • Task planning answers the question of which object types are affected and who must do what and when. Task execution followed by confirmation ensures that maintenance is performed and operator obligations are verifiably met.

  • The following example illustrates this: The general inspection is a measure (independent of people or objects)

  • The car is the object type. The inspection steps required for the general inspection are defined for this object type. These are the standard work plans, e.g., checking the lighting. A measure therefore has subordinate standard work plans (lighting check). A standard work plan, in turn, has subordinate standard work operations (check front left turn signal).

To product page
War dieser Artikel hilfreich?