Use cases: Automatic date calculations

FM-Portal

IC2905
FM-Portal

Contract Management helps you calculate key contract data. This documentation explains how the automatic calculations work in various scenarios and what data you need to maintain.

Case 1: Create a New Contract

Description

You enter a new contract with all basic data. The contract has not yet been renewed.

Fields to be filled in

  • Contract start date: e.g., 01/01/2024

  • Minimum term (number): e.g., 12

  • Minimum term (time unit): e.g., months

  • Renewal (number): e.g., 12

  • Renewal (time unit): e.g., months

  • Notice period (number): e.g., 3

  • Notice period (time unit): e.g., months

Important note: Carefully review the contract basis data. After the first renewal, the following fields become read-only and can no longer be modified:

  • Contract start date

  • Minimum term (number)

  • Minimum term (time unit)

  • Contract end date Minimum term

Automatically calculated fields

  • Contract end minimum term: calculated immediately upon completion

  • Expiration of notice period: calculated immediately upon completion

Non-calculated fields

  • Contract end date after renewal: remains blank

  • Renewals completed: remains blank

Time of calculation

The calculation is performed automatically in the browser as you enter data, as soon as the required fields are filled in.

Calculation basis

  • Contract end date: Minimum term = Contract start date + Minimum term

  • Expiration of notice period = Contract end date minus minimum term

Example

A lease agreement begins on January 1, 2024, with a minimum term of 12 months. Upon signing the agreement, it is stipulated that the agreement automatically renews for 12 months at a time unless notice of termination is given 3 months prior to the end of the term.

Input:

  • Contract start date: 01/01/2024

  • Minimum term: 12 months

  • Renewal: 12 months

  • Notice period: 3 months

Result:

  • End of minimum term: 12/31/2024

  • Expiration of notice period: September 30, 2024

  • Contract end date after renewal: blank


Case 2: Renew contract

Description

An existing contract is being renewed for the first or subsequent time. This is done via the "Renew Contract" menu item in the "Extras" menu.

Prerequisites

  • Contract has already been created

  • Extension (Number) and Extension (Time Unit) are filled in

Action

  1. Save the contract if you haven’t already

  2. In the "Tools" menu, select "Renew Contract"

Automatically calculated fields

  • Contract end date after renewal: is recalculated

  • Extensions completed: increased by 1

  • Expiration of notice period: recalculated

Locked fields after renewal

  • Contract start date: becomes read-only after the first renewal

  • Minimum term (number): becomes read-only after the first renewal

  • Minimum term (time unit): becomes read-only after the first extension

  • Contract end of minimum term: becomes read-only after the first renewal

This prevents accidental changes to the contract basis after renewals have already been performed. All renewal calculations are based on this basic data.

Time of calculation

The calculation is performed by a database procedure when "Renew Contract" is called.

Calculation basis

For the first renewal:

  • Contract end date after extension = Contract end date (minimum term) + Extension

  • Number of renewals performed = 1

For subsequent renewals:

  • Contract end date after renewal = previous contract end date after renewal + renewal

  • Extensions completed = previous value + 1

Always:

  • Expiration of notice period = new contract end date after extension - notice period

Example

The contract from Case 1 expires on December 31, 2024. On September 15, 2024, you decide not to terminate the contract.

Before the extension:

  • Contract end date (minimum term): December 31, 2024

  • Contract end date after renewal: blank

  • Extensions performed: blank

After clicking "Renew Contract":

  • Contract end date after renewal: 12/31/2025

  • Extensions completed: 1

  • Expiration of notice period: 09/30/2025

After the second extension:

  • Contract end date after renewal: 12/31/2026

  • Extensions completed: 2


Case 3: Change renewal conditions

  • The fields "Minimum Term (Number)" and "Minimum Term (Time Unit)" are read-only

Description

The renewal terms of an existing contract are adjusted before the next renewal is carried out. This may be necessary, for example, due to a contract amendment.

Prerequisites

  • The contract has already been renewed at least once

  • The contract end date after renewal has a value

  • The contract basis fields (contract start, minimum term, contract end minimum term) are read-only

Fields to be filled in

  • Renewal (Number): new value, e.g., 6 instead of 12

  • Renewal (time unit): new unit, if applicable

Action

  1. Change the renewal data (number and/or time unit)

  2. Save the contract

  3. In the "Tools" menu, select "Renew Contract"

Automatically calculated fields

  • Contract end date after renewal: calculated based on the previous date

  • Extensions performed: increased by 1

Time of calculation

When "Renew Contract" is selected after the change.

Calculation basis

  • Contract end date after renewal = previous contract end date after renewal + new renewal

  • The calculation is based on the last saved date, not the original contract end date

Example

A contract has already been extended twice, each time by 12 months. The current contract end date after extension is December 31, 2026. The contracting parties agree on shorter extension intervals of only 6 months.

Change:

  • Extension (number): 6 (previously: 12)

  • Renewal (time unit): Months (unchanged)

After the third extension:

  • Contract end date after extension: June 30, 2027 (not June 30, 2025!)

  • Extensions completed: 3

The calculation correctly takes into account that two extensions of 12 months each have already taken place and adds the new 6-month extension to the current status.


Case 4: Create a historical contract without a renewal history

Description

You are entering a contract that existed prior to the introduction of eTASK and has already been extended. The exact number of previous extensions is unknown or irrelevant.

Fields to be filled in

  • Contract start: original date

  • Minimum term (number) and Minimum term (time unit)

  • Renewal (number) and renewal (time unit)

  • Contract end date after renewal: enter manually (current status)

  • Notice period: if known

Automatically calculated fields

  • Contract end date (minimum term): automatically calculated based on contract start date + minimum term

  • Expiration of notice period: based on contract end date after extension

Note: If the automatically calculated "Contract end - minimum term" does not match the contract documents (e.g., in the case of special agreements at the end of the month), you can correct it manually. However, changes to the contract start date or minimum term will override manual entries.

Non-calculated fields

  • Extensions completed: remains empty or is estimated manually

Time of calculation

  • Minimum term calculation: automatically during entry

  • No automatic calculation for "Contract end after renewal"

Example

A contract from 2020 is entered into eTASK. The contract has a minimum term of 24 months and renews for 12 months at a time. You know that the contract currently runs until December 31, 2026.

Input:

  • Contract start date: January 1, 2020

  • Minimum term: 24 months

  • Renewal: 12 months

  • Contract end date after renewal: December 31, 2026 (manual)

  • Extensions completed: empty

For the next renewal in eTASK:

  1. Save the contract

  2. Select "Renew Contract" in the "Tools" menu

Result:

  • Contract end date after renewal: 12/31/2027

  • Renewals performed: 1

The first renewal performed in eTASK correctly calculates the term starting from the manually entered date of 12/31/2026.


Case 5: Create a historical contract with renewal history

Description

You are entering a contract that existed prior to the introduction of eTASK and has already been renewed several times. The number of previous renewals is known and documented.

Fields to be filled in

  • Contract start: original date

  • Minimum term (number): e.g., 24

  • Minimum term (time unit): e.g., months

  • Contract end of minimum term: calculated automatically or corrected manually

  • Renewal (number): e.g., 12

  • Renewal (time unit): e.g., months

  • Contract end date after renewal: current status (enter manually)

  • Renewals completed: Number of renewals to date (enter manually)

  • Notice period (number) and notice period (time unit): if known

Automatically calculated fields

  • Contract end date (minimum term): automatic calculation based on contract start date + minimum term

  • Expiration of notice period: based on the manually entered contract end date after renewal

Note: If the automatically calculated "Contract end - minimum term" does not match the contract documents (e.g., in the case of special agreements), you can correct it manually. However, changes to the contract start date or minimum term will override manual entries.

Fields to be maintained manually

  • Contract end date after renewal: must be manually entered with the correct current status

  • Extensions performed: for documentation and traceability

Time of calculation

  • Contract end date (minimum term): calculated automatically while entering data in the browser

  • No automatic calculation for "Contract end after renewal"

  • Expiration of notice period: automatically based on the entered contract end date after renewal

Calculation basis

The entry in "Extensions Performed" does not affect automatic calculations. It is for informational purposes only. The "Contract End Date After Extension" field must be manually maintained correctly.

For the first renewal in eTASK, the system will calculate based on the manually entered "Contract end after renewal," not on the number of renewals performed.

Example

A service contract from 2020 is entered in eTASK. The contract had a minimum term of 24 months and automatically renews for 12 months at a time. You know from the contract documents that the contract has already been renewed three times and currently runs until December 31, 2026.

Input when creating:

  • Contract start date: January 1, 2020

  • Minimum term: 24 months

  • Minimum term (number): 24

  • Minimum term (time unit): Months

  • Renewal (number): 12

  • Renewal (time unit): months

  • Contract end date after renewal: 12/31/2026 (entered manually)

  • Extensions performed: 3 (entered manually for documentation)

Calculated automatically:

  • Contract end date (minimum term): 12/31/2021

Upon the first renewal in eTASK:

  1. Save the contract (if not already done)

  2. Select "Renew Contract" in the "Tools" menu

Result after renewal:

  • Contract end date after renewal: 12/31/2027 (calculated: 12/31/2026 + 12 months)

  • Renewals completed: 4 (previous value 3 + 1)

  • Expiration of notice period: updated accordingly

Important

Documenting previous extensions in "Extensions completed" helps track the contract history but does not affect the calculation of the new contract end date. The date in "Contract end date after extension" is always decisive for the calculation.


Case 6: Change contract basis data for an existing contract

Description

The contract basis data (contract start date, minimum term, contract end date after minimum term) are corrected retroactively before the first extension was carried out. This may be necessary for corrections or subsequent contract adjustments.

Prerequisites

  • Contract has been created

  • Renewals performed = 0 or empty

  • Contract base data is to be corrected

Important

After the first renewal, the contract basis fields are locked and can no longer be changed. This protects the calculation basis from unintended changes.

Editable fields (only before the first renewal)

  • Contract start date: can be corrected

  • Minimum term (number): new value

  • Minimum term (time unit): new unit if applicable

Note: These fields can only be edited as long as the contract has not yet been renewed (Renewals Performed = 0 or empty).

Note on "Contract end date (minimum term)": This field is calculated automatically as soon as the contract start date and minimum term are entered. The contract end date is recalculated whenever these fields are changed. Manual entry is not required for standard contracts.

Automatically calculated fields

  • Contract end date (minimum term): is immediately recalculated if the contract start date or minimum term is changed

  • Expiration of notice period: is recalculated when the contract end date is changed

Non-calculated fields

  • Contract end date after renewal: remains blank (since no renewal has occurred yet)

Time of calculation

Immediately while entering data in the browser.

Example 1: Correcting the minimum term

A contract was entered with a 12-month minimum term. Upon review, you notice that 24 months were agreed upon in the contract.

Before the correction:

  • Contract start date: 01/01/2024

  • Minimum term: 12 months

  • Contract end (minimum term): 12/31/2024

After the correction:

  • Minimum term: 24 months

  • End of minimum term: 12/31/2025 (automatically renewed)

  • Expiration of notice period: adjusted accordingly

Example 2: Correcting the contract start date

A contract was accidentally entered with the wrong start date.

Before correction:

  • Contract start date: July 1, 2024

  • Minimum term: 12 months

  • Contract end (minimum term): 06/30/2025

After correction:

  • Contract start date: January 1, 2024 (corrected)

  • Contract end date (minimum term): 12/31/2024 (automatically updated)

Important: Such corrections are only possible as long as the contract has not yet been renewed.


Case 7: Contract with special agreement

Description

Some contracts are subject to special agreements that deviate from the standard calculation rules. In these cases, the data is maintained manually.

Procedure

  • Fill in all relevant fields manually

  • Do not execute the renewal function

  • Maintain "Contract End Date After Renewal" manually if necessary

Example

A contract has a special clause stating that the first renewal is for 18 months and all subsequent renewals are for 12 months. Such a case cannot be mapped automatically.

Solution:

  • Enter the basic data as usual

  • Enter "Contract End Date After Renewal" manually

  • Update the date manually with each renewal

  • Use the comments field to document the special provision

  • Do not use the “Renew Contract” function; instead, change the data manually


Case 8: Correct an incorrectly entered contract

Description

A contract has already been renewed, but you notice that the contract basis data (contract start date, minimum term) was entered incorrectly. By resetting the renewal history, you can correct the data and re-create the contract.

Prerequisites

  • The contract has been created and has already been extended (Extensions Performed > 0)

  • Incorrect data in the contract basis fields has been identified

  • You know the correct current status of the contract

Important

This procedure should only be used to correct data entry errors, not for regular contract changes or renegotiations. For legally relevant changes, a new contract should be created if necessary.

Action: Step-by-Step Guide

Step 1: Reset the renewal history

  • Open the contract with errors

  • Set the "Extensions Performed" field to 0 or delete the value

  • Save the contract

Step 2: Correct the
contract basis The contract basis fields are now editable again:

  • Correct "Contract Start Date"

  • Correct "Minimum Term (Number)" and "Minimum Term (Time Unit)"

  • "Contract End (Minimum Term)" is automatically recalculated

Step 3: Enter the current contract status

  • Manually enter the correct current status in "Contract End After Extension"

  • Optional: Enter the actual number in "Extensions Performed" for documentation purposes

Step 4: Save

  • Save all changes

  • The contract is now corrected and behaves like a historical contract (Case 4 or 5)

Behavior after the correction

  • The corrected contract behaves like Case 4 or Case 5

  • At the next renewal in eTASK, the system will calculate based on the manually entered "Contract end date after renewal"

  • The contract basis fields will be read-only again after the next renewal

Calculation timing

  • Contract end date (minimum term): is recalculated immediately upon correction of the contract start date or minimum term

  • Contract end after renewal: is not calculated automatically; must be entered manually

Example

A contract was entered on June 15, 2024, with a contract start date of January 1, 2024, and a minimum term of 12 months. The contract has already been extended twice, each time by 12 months. During a review, you determine that the actual contract start date was July 1, 2023.

Current incorrect status:

  • Contract start date: January 1, 2024 (incorrect)

  • Minimum term: 12 months

  • End of minimum term: December 31, 2024

  • Extension: 12 months

  • Contract end date after renewal: 12/31/2026

  • Extensions completed: 2

Perform correction:

Step 1: Reset

  • Extensions performed: 0 (or delete)

  • Save

Step 2: Correct contract basis

  • Contract start date: 07/01/2023 (corrected)

  • Minimum term: 12 months (unchanged)

  • Contract end (minimum term): 06/30/2024 (automatically calculated)

Step 3: Enter current
status The contract actually runs until June 30, 2026 (not December 31, 2026):

  • Contract end date after renewal: June 30, 2026 (manually corrected)

  • Extensions completed: 2 (optional for documentation)

Step 4: Save

Result after correction:

  • Contract start date: July 1, 2023 ✓

  • Contract end date (minimum term): June 30, 2024 ✓

  • Contract end date after extension: 06/30/2026 ✓

  • Extensions completed: 2

Upon the next renewal:

  • Contract end date after renewal: June 30, 2027 (correctly calculated: June 30, 2026 + 12 months)

  • Extensions completed: 3

  • Contract basis fields are set to read-only again

Avoid common errors

  • Don’t forget: “Contract end date after renewal” must be manually entered with the correct current status after the correction

  • Documentation: Use the comment field to document the correction made

  • Timing: Do not make corrections shortly before a scheduled extension, but allow sufficient lead time


Summary: Which fields are calculated automatically?

Automatic calculation in the browser (immediately upon entry)

  • Contract end date (minimum term): based on contract start date + minimum term

  • Expiration of notice period: based on contract end date or contract end date after renewal

Calculation via "Renew Contract" (Tools menu)

  • Contract end date after renewal: based on last contract end date + current renewal dates

  • Extensions performed: increased by 1

  • Expiration of notice period: is updated

Important: The contract must be saved before calling up "Extend Contract".

Never calculated automatically

  • Contract start date: must always be entered manually; read-only after the first renewal

  • Minimum term (number) and Minimum term (time unit): Always enter manually; read-only after the first renewal

  • Renewal (number) and renewal (time unit): always manual

  • Notice period (number) and notice period (time unit): always enter manually

Note: The "Contract end minimum term" field is calculated automatically. It can be overwritten manually (e.g., for historical contracts with special agreements), but is recalculated if changes are made to the contract start date or minimum term. After the first renewal, it is also read-only.