Deutsch
|
English

Equipment feedback

Support Center

IC12022

Navigation to this function

This data object records detailed information about the use of operating resources as part of maintenance measures. It documents time expenditure, costs and specific usage parameters such as start and end times as well as set-up times for each piece of equipment used. This data is used to precisely track and analyze the use and efficiency of resources in maintenance processes and supports cost accounting and the operational planning of maintenance and repair work.


Identification

In this info area you will find information that can be used to identify the data record. This is usually the code and the name, together with other important information.
PropertyDescription
RemSpecification of the equipment
OnSpecification of the order for which feedback is being provided.

Details

This group contains general information on the equipment feedback report. It includes basic properties that enable the context and identification of the report.
PropertyDescription
Cost UnitIndication of the cost unit for the use of the equipment.
TimeIndication of the time required for the equipment.
CostsIndication of the costs for the use of the equipment.
StartSpecification of the start time for the equipment.
Setup TimeSpecification of the set-up time for the equipment.
EndSpecification of the end time for the equipment.
Time UnitSpecification of the time unit for the use of the equipment.
War dieser Artikel hilfreich?