Deutsch
|
English

Distribute meter losses

Property Management

IC2198
Property Management

If you bill energy consumption based on meter groups, you can allocate meter losses in eTASK.Operating Cost Billing.

Orange button with white text
Orange button with white text "Voraussetzung" and an icon of a checklist or document on the left side

  • Meter billing is performed via meter groups and is fully configured

Orange banner with white text reading
Orange banner with white text reading "Vorgehensweise im FM-Portal" (Procedure in FM Portal)

Path to the starting point: Technical Building Management - Energy Consumption Billing - Meter Groups

  1. Enter the losses for the meter group.

  2. Click on "Close the Entry Month" in the menu bar.

When operating costs for the building are recalculated, the losses will now also be allocated to the tenants.

War dieser Artikel hilfreich?