Budget planning from diagnostic results

Gebäudediagnose

IC12622
eTASK Chili
Building Analyses
eTASK Neon
Facility Manager

How to automatically create a budget proposal with actions and an annual plan based on a building assessment.

What does the budget generation feature do?

After evaluating all diagnostic elements, you can transfer the results directly into a budget project.

The system automatically creates:

  • A budget project with all master data from the assessment

  • Budget items for each evaluated element

  • Annual budgets based on the calculated replacement years

Advantage: Multi-year investment planning that can be further processed directly in Budget Management.

Process: From diagnosis to budget

Step 1: Complete the diagnosis

Prerequisites:

  • Geometric coefficients recorded

  • All elements evaluated

Step 2: Generate budget

Menu bar → Create Budget Project

The system creates:

A) Budget project

  • Number: Diagnosis code

  • Name: "Code - Description"

  • Building: From diagnosis

  • Status: Planned (fixed)

  • Type: Maintenance (fixed)

  • Maximum Budget: Total of all costs

B) Budget items

For each item with costs > €0:

  • Name: "[Element type]: [Action]"

  • Budget: Cost in €

  • Status: Planned (fixed)

C) Annual budgets

For each item, an entry with:

  • Budget year = (Replacement year Min + Replacement year Max) / 2

  • Budget: Costs in €

Example budget year:

  • Min: 2028, Max: 2032

  • Budget year = (2028 + 2032) / 2 = 2030

Step 3: Review budget

  1. Refresh form (F5)

  2. Check {Budget Management} info area

  3. Open budget project

  4. Check items and annual distribution

Example

Diagnosis for a building

Total: €270,000

Generated budget project

Project:

  • Number: DIAG-2026-001

  • Name: DIAG-2026-001 - Musterstraße Apartment Building

  • Status: Planned

  • Type: Maintenance

  • Start: 2025 (earliest year)

  • End: 2050 (latest year)

  • Budget: €270,000

5 budget items:

No.

Name

Budget (€)

Year

001

Heating: Complete replacement

120,000

2026

002

Roof: Replacement of roofing material

85,000

2027

003

Facade: Replacement of exterior plaster

45,000

2030

004

Stairs: Renovation of flooring

12,000

2038

005

Foundation: Waterproofing

8,000

2048

Annual overview:

  • 2026: €120,000 (heating)

  • 2027: €85,000 (roof)

  • 2030: €45,000 (facade)

  • 2038: €12,000 (stairs)

  • 2048: €8,000 (Foundation)

Prioritization

After generation, you can adjust the order:

By availability

Budget only for 2026–2030?

  • Postpone later measures

  • Prioritize early measures

Funding available?

  • Bring forward relevant measures

  • Note the application period

Combine measures

Example: Facade renovation

  • Item 1: Facade – Exterior plaster (€45,000)

  • Item 2: Windows – Replacement (€38,000)

  • Combined: "Complete facade" (€83,000)

  • Advantage: Scaffolding needed only once, better tender

Shift annual budgets

Smoothing cash flow:

Problem: 2027 = €205,000 (roof + heating), but only €120,000 available

Solution:

  1. Open the "Roof" budget line item

  2. Move the annual budget from 2027 to 2028

  3. Check new allocation

Result:

  • 2027: €120,000 (Heating)

  • 2028: €85,000 (roof)

Reports

Final Building Diagnosis Report

Menu bar → Final Building Diagnosis Report

Includes an annual overview at the end with costs per year:

Year

Cost

Measures

2026

€120,000

Heating

2027

€85,000

Roof

2030

€45,000

Facade

2038

€12,000

Stairs

2048

€8,000

Foundation

Total

€270,000

Benefits: Preview before budget creation, documentation afterward

Master list

Reports → Master List of Building Assessments and Budgets

Displays:

  • Diagnosis Code

  • Building

  • Linked Budget Project

  • Totals for annual periods

Benefits: Portfolio overview across multiple buildings

Summary

Process:

  1. Evaluate diagnosis completely

  2. Click to create budget project

  3. Review and adjust the budget

The budget includes:

  • Project with total amount

  • Items per element

  • Annual distribution (calculated automatically)

Important:

  • Status/Type are fixed: "Planned" / "Maintenance"

  • Budget year = average of Min/Max

  • No automatic synchronization

  • Manually adjust prioritization and scheduling