Deutsch
|
English

Billing scenario: Manual costs for a building

Property Management

IC2270
Property Management

If there are costs that need to be allocated to a single building, you can do so under Property Management - Operating Cost Allocation - Allocation.

Prerequisite

The billing year has already been created

Procedure in the FM Portal

Path to the starting point: Property Management - Operating Cost Settlement - Settlement

  1. In the menu, click on the billing year, the location, and the building.

  2. Under Actions, click Add Costs to Building. A new window will open.

  3. Select the cost type, G/L account, VAT rate, and period.

  4. Enter the net amount in euros and a description of the costs.

  5. Click Save.

Dropdown menu
Dropdown menu "Aktionen" with options: "Gebäude berechnen", "Gebäude als erledigt markieren", "Kosten zum Gebäude hinzufügen"

The costs have been added to the tenant and will be included in the operating cost statement.

Note: Costs allocated in this way will be lost if the billing year is deleted.

War dieser Artikel hilfreich?